SC Services during OnM stage of 4 laning of Jaipur Reengus section of NH 11 (New NH 52) from Km. 246.300 to Km. 298.075 in the State of Rajasthan (Total Length 51.842 Kms)
National Highway Authority of India Operation & Maintenance: -Ongoing...
Rectification of MoRTH identified blackspot at 07 locations on Jaipur- Reengus-Sikar section of NH-52 in the state of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.
National Highway Authority of India Supervision/Construction: -Ongoing...
Rectification of MoRTH identified blackspot at 03 locations on Jaipur- Reengus-Sikar section of NH-52 in the state of Rajasthan on Engineering, Procurement & Construction (EPC) Mode.
National Highway Authority of India Supervision/Construction: -Ongoing...
Re-Construction of Reengus ROB Destressed RE Wall LHS and Strengthening of Existing Reengus ROB RHS in Jaipur-Reengus-Sikar section of NH-52 from km296.200 to 297.350 (Total Length: 1150m) in the state of Rajasthan.
National Highway Authority of India Supervision/Construction: -Ongoing...
No post found